Monthly assurance report · Sample
September 2026
- Premises
- A 32 bed residential care home
- Cover
- All 13 regulatory areas
- Assets
- 157 on the register
- Position
- 10 of 13 areas in order
- Inspection
- Compliance pack complete and ready
01 Scheduled compliance
What we did
- We confirmed the fire alarm six monthly service, then verified and filed the certificate.
- We confirmed the emergency lighting annual test, then verified and filed the report.
- We reviewed the fire door inspection. Three doors failed: one closer was repaired on the day, and we followed up the contractor for the other two, now booked for 30 October.
- We returned the gas safety certificate to the engineer because it omitted the kitchen range, and filed the complete certificate once it was reissued.
- When the lift contractor stopped trading, we sourced a replacement, verified its accreditation and insurance, and put it to the home to appoint. The November examination is booked with them.
- We verified the hoist and sling thorough examination reports. All passed.
- One profiling bed failed its service. The home took it out of use, and we booked the repair.
- We followed up the water hygiene contractor for the monthly temperature report, and filed it on receipt.
- We reviewed the home’s weekly and monthly checks: water temperatures, fire alarm tests and medicine fridge readings were all recorded and within limits.
Assets and equipment
| Asset | On the register | Due this month | Completed | Open defects |
|---|---|---|---|---|
| Fire doors | 46 | 46 | 46 | 2 |
| Fire alarm system | 1 | 1 | 1 | 0 |
| Emergency lighting units | 58 | 58 | 58 | 0 |
| Passenger lift | 1 | 0 | 0 | 0 |
| Hoists and slings | 14 | 14 | 14 | 0 |
| Profiling beds | 32 | 32 | 32 | 1 |
| Boilers and gas appliances | 3 | 3 | 3 | 0 |
| Medicine fridges | 2 | 2 | 2 | 0 |
| Total | 157 | 156 | 156 | 3 |
Coming up
| Item | When | Where it stands |
|---|---|---|
| Passenger lift thorough examination | 14 November | Booked |
| Legionella risk assessment review | Mid November | Booking this week |
| Fixed wiring remedial works sign off | 20 November | Booked |
| Fire drill for the night team | November | Date agreed with the home |
02 Defects and hazards
Open actions
| Area | Action | Priority | Owner | Target date |
|---|---|---|---|---|
| Fire safety | Fire door to room 14 does not close fully. Adjust or replace the closer. | High | Your fire door contractor | 30 October |
| Fire safety | Fire door to the first floor lounge has a damaged seal. Replace the seal. | Medium | Your fire door contractor | 30 October |
| Care equipment | Profiling bed in room 9 failed its service. Repair and retest before return to use. | High | Your bed maintenance contractor | 24 October |
Patterns
- The fire door to room 14 has now failed three inspections in twelve months, each time on its closer. We recommend your fire door contractor assesses replacing the door set rather than repairing it again.
03 Register and evidence
Regulatory updates
No changes to premises regulations or guidance affecting your home this month. When a change applies, it is set out here with what it means for your home, and your register is updated.
Position by area
- Fire safety2 actions openAttention
- Water hygieneRisk assessment review due in 6 weeksDue soon
- Lifting equipmentLift examination booked for 14 NovemberIn order
- Electrical safetyIn order
- Gas safetyIn order
- Pressure systemsIn order
- Ventilation and air conditioningIn order
- AsbestosIn order
- Care equipment1 action openAttention
- Medicine storageIn order
- Premises safetyIn order
- Hazardous substancesIn order
- WasteIn order
Service levels
| Measure | This month |
|---|---|
| Records requested on the day they fall due | 41 of 41 |
| Certificates and reports read within the agreed timeOne report was read a day late. The cause was found and the routine corrected. | 8 of 9 |
| Failures reported to you within the agreed time | 4 of 4 |
| Renewals booked before they fall due | 4 of 4 |